Once the holding stage ends, the cooling stage begins. The mold is equipped with internal cooling channels (hollow tubes) through which a coolant (usually water or oil) circulates. The coolant absorbs heat from the molten plastic, causing it to solidify into the shape of the mold cavity. The cooling time is determined by the plastic’s thickness, thermal conductivity, and melting point: thin parts (e.g., a 1mm-thick smartphone case) may cool in 10–20 seconds, while thick parts (e.g., a 10mm-thick plastic container) require 1–2 minutes.
Cooling is a critical stage for product quality: if cooled too quickly, the plastic may develop internal stresses or cracks; if cooled too slowly, production cycles lengthen, reducing efficiency. The machine’s controller monitors the mold temperature to ensure consistent cooling across each cycle. Once the plastic is fully solidified, the cooling stage ends.
Technical Parameter | |||||
Part | Name | Unit | NT230 | ||
Injection unit | SCREW DIAMETER | mm | 45 | 50 | 55 |
SCREW L/D RATIO | L/D | 22.2 | 20 | 18.2 | |
SHOT VOLUME(THEORETICAL) | CM3 | 397 | 490 | 594 | |
INJECTION WEIGHT(PS) | g | 361 | 445 | 540 | |
INJECTION PRESSURE | Mpa | 221 | 179 | 148 | |
INJECTION RATE | cm⊃3;/sec | 192 | 237 | 287 | |
PLASTICZATION CAPACITY(PS) | g/sec | 26 | 36 | 48 | |
INJECTION STROKE | mm | 250 | |||
INJECTION SPEED | Mm/sec | 121 | |||
SCREW SPEED | rpm | 210 | |||
Clamping unit | CLAMP FORCE | Kn | 2300 | ||
OPEN STROKE | mm | 490 | |||
SPACE BETWEEN TIE BARS | mm×mm | 530X530 | |||
MAX.MOULD HEIGHT | mm | 550 | |||
MIN.MOULD HEIGHT | mm | 200 | |||
EJECTOR STROKE | mm | 145 | |||
EJECTOR FORCE | Kn | 70 | |||
EJECTOR NUMBER | N | 9 | |||
Others | MAX.PUMP PRESSURE | Mpa | 16 | ||
PUMP MOTOR POWER | Kw | 29 | |||
HEATING POWER | Kw | 12.5 | |||
MACHINE DIMENSION(L*W*H) | m×m×m | 5.6*1.45*2.1 | |||
MACHINE WEIGHT(ESTIMATE) | T | 6.5 | |||




1. Q: What is the product range?
A: Focus on the manufacture and development of plastic injection molding machines and its auxiliary equipment such as cooling tower, chiller, etc.
2. Q: Where is your main selling market?
A: We have business domestic, USA, Russia, Indonesia, Egypt, Turkey, Uzbekistan, Pakistan, etc.
3. Q: Will you offer field installation and operator training at the buyer's factory?
A: Yes, we will arrange our skilled engineers for filed installation and training.
4. Q: What is the delivery time(equipment production time)?
A: It will be ready around 50-75 days after getting mutual confirmation about the order details and prepayment.
5. Q: Do you also have source for molds and spare parts?
A: Yes, we can offer with the competitive quality and reasonable price. Customized as required.
6. Q: What is the standard of package?
A: Wooden case packing for the auxiliary equipment, bare packing for the plastic injection molding machine. Full container shipment is highly suggest.




Once the holding stage ends, the cooling stage begins. The mold is equipped with internal cooling channels (hollow tubes) through which a coolant (usually water or oil) circulates. The coolant absorbs heat from the molten plastic, causing it to solidify into the shape of the mold cavity. The cooling time is determined by the plastic’s thickness, thermal conductivity, and melting point: thin parts (e.g., a 1mm-thick smartphone case) may cool in 10–20 seconds, while thick parts (e.g., a 10mm-thick plastic container) require 1–2 minutes.
Cooling is a critical stage for product quality: if cooled too quickly, the plastic may develop internal stresses or cracks; if cooled too slowly, production cycles lengthen, reducing efficiency. The machine’s controller monitors the mold temperature to ensure consistent cooling across each cycle. Once the plastic is fully solidified, the cooling stage ends.
Technical Parameter | |||||
Part | Name | Unit | NT230 | ||
Injection unit | SCREW DIAMETER | mm | 45 | 50 | 55 |
SCREW L/D RATIO | L/D | 22.2 | 20 | 18.2 | |
SHOT VOLUME(THEORETICAL) | CM3 | 397 | 490 | 594 | |
INJECTION WEIGHT(PS) | g | 361 | 445 | 540 | |
INJECTION PRESSURE | Mpa | 221 | 179 | 148 | |
INJECTION RATE | cm⊃3;/sec | 192 | 237 | 287 | |
PLASTICZATION CAPACITY(PS) | g/sec | 26 | 36 | 48 | |
INJECTION STROKE | mm | 250 | |||
INJECTION SPEED | Mm/sec | 121 | |||
SCREW SPEED | rpm | 210 | |||
Clamping unit | CLAMP FORCE | Kn | 2300 | ||
OPEN STROKE | mm | 490 | |||
SPACE BETWEEN TIE BARS | mm×mm | 530X530 | |||
MAX.MOULD HEIGHT | mm | 550 | |||
MIN.MOULD HEIGHT | mm | 200 | |||
EJECTOR STROKE | mm | 145 | |||
EJECTOR FORCE | Kn | 70 | |||
EJECTOR NUMBER | N | 9 | |||
Others | MAX.PUMP PRESSURE | Mpa | 16 | ||
PUMP MOTOR POWER | Kw | 29 | |||
HEATING POWER | Kw | 12.5 | |||
MACHINE DIMENSION(L*W*H) | m×m×m | 5.6*1.45*2.1 | |||
MACHINE WEIGHT(ESTIMATE) | T | 6.5 | |||




1. Q: What is the product range?
A: Focus on the manufacture and development of plastic injection molding machines and its auxiliary equipment such as cooling tower, chiller, etc.
2. Q: Where is your main selling market?
A: We have business domestic, USA, Russia, Indonesia, Egypt, Turkey, Uzbekistan, Pakistan, etc.
3. Q: Will you offer field installation and operator training at the buyer's factory?
A: Yes, we will arrange our skilled engineers for filed installation and training.
4. Q: What is the delivery time(equipment production time)?
A: It will be ready around 50-75 days after getting mutual confirmation about the order details and prepayment.
5. Q: Do you also have source for molds and spare parts?
A: Yes, we can offer with the competitive quality and reasonable price. Customized as required.
6. Q: What is the standard of package?
A: Wooden case packing for the auxiliary equipment, bare packing for the plastic injection molding machine. Full container shipment is highly suggest.